Project Overview: Ahead of its 75th anniversary repaint, the Bridge Authority coated the lowest 12…
Project Overview:
A manufacturer needed a durable, industrial-grade epoxy floor for its 100,000 sq ft warehouse—but traditional grinding alone would have taken 5 weeks.
Why Property Owners Love It:
- Occupancy in 1 Week: From bare concrete to finished floor in 7 days, so operations resume faster.
- Eliminate Dust & Cleanup Costs: Fusion Primer bonds without grinding—no airborne silica dust or costly cleanup.
- Boosted Asset Longevity: Extremely strong bond ensures years of wear resistance, protecting your investment.

Contact Us
"*" indicates required fields



